By EVST Editorial Team · Reviewed by EVST Editorial Team · · Method: on-site footage of this cell for the process loop; general engineering practice for the design decisions · Editorial policy · Corrections policy · Terms
In short: This cell loads and unloads two CNC lathes with a single six-axis robot. The robot stands on a pedestal between the machines and reaches into each in turn; while one lathe cuts, the robot is already at the other door. A stepped, crankshaft-type shaft sits in a three-jaw chuck with a support holding the far end, and chips curl away from the end face and the outside diameter as the cut runs. Three decisions carry a layout like this: how the load station locates each blank, how the gripper holds a stepped shaft without it slipping, and how the two lathes share one robot’s time so neither machine waits. Planning something similar? Send us your part drawing.

At a glance
| Part | Stepped shaft — crankshaft-type part cut on its end face and outside diameter |
| Process | CNC turning |
| Automation | One six-axis robot serving two CNC lathes |
| Part supply | Blanks queued on an inclined track beside the cell |
| Locating | A slotted fixture plate receives each blank before the gripper closes |
| Workholding | Three-jaw chuck grips one end; a support holds the far end |
| Operator role | Walks the shop; loading and unloading are the robot’s job |
| Cell layout | Two lathes with the robot on a pedestal between them |
The problem this cell addresses
A shaft part rarely goes through the machine in one clamping. The end face, the outside diameter and the shoulders have to be cut in sequence, and each pass is over before the operator has finished the last one. When a person tends a lathe by hand, they stand beside the machine through the whole cycle, and two machines mean two people or one person hurrying between them.
Handing the tending to a robot changes that. The robot is the one that moves between the two doors, so the person stops being a fixture of the cell. The real engineering is not the loading motion itself — it is making sure every blank arrives in the same place, that a gripper holds a stepped part without it turning in the fingers, and that the two machines never stand idle because the robot is busy at the other one.
How the cell runs
- Blanks queue up. Rough shafts sit in a row on an inclined track at the side of the cell, each waiting at a fixed pick position.
- Locate the blank. A blank stops on a slotted fixture plate; the plate, not the robot, decides where the part is.
- Grip from above. A cross arm reaches over the part, closes on it and lifts it clear of the plate.

- Hand off to the chuck. The robot carries the blank to the first lathe and presents it to the black three-jaw chuck.
- Clamp and support. The chuck closes on one end of the shaft while a support at the far end holds the other; the part is now fixed for cutting.
- Cut. A tool comes in on the end face and the outside diameter, and chips curl away from the cut.

- Swap sides. When that machine is finished, the robot takes the part out and turns to the other lathe, which has been waiting with its own cycle ready.

Three design decisions
1. Let the load station own the position
The robot can only be as repeatable as the place it picks from. A blank sitting loose on a track is not a pick point — a blank resting against a locator is. The load station here is a slotted plate that receives each part, so the gripper always closes on the part in the same place.
What to settle first: how the blank is presented, which faces the locators touch, and whether the gripper can close without nudging the part off the plate.
2. Make the gripper match the shaft’s steps
A stepped shaft is easy to hold badly. A straight two-finger grip lands on whichever diameter happens to be in the way, and the part can slide or cock as it is lifted. The gripper should bear on a known shoulder or diameter and keep its hold through the turn and the hand-off into the chuck.
The check is simple: can the robot hold the blank through every move it makes — from the plate, into the chuck, and back out after cutting — without the part shifting in the fingers?
3. Share the two lathes, not just serve them
Two lathes and one robot only win if the robot is never the bottleneck. That means sequencing the machines so the robot alternates cleanly: unload one, load it, and be at the other door before that machine finishes its cut.

The rough question is balance. If both lathes cut for about the same length of time, the robot’s hand-offs slip neatly between them; if one machine runs much longer than the other, the layout starts to look like one machine with a spare.
When this layout fits — and when to look closer
- Good fit: shaft or round parts turned in several passes, two machines that hold each other’s rhythm, and blanks an operator can stack on a track in batches.
- Evaluate further: parts too long or heavy for a single gripper to carry, diameters that change a lot between part numbers so the gripper has to change with them, machines with very different cycle times that pull the robot out of step, and any part that has to be flipped between operations.
FAQ
Does the robot have to stand between the two lathes?
Not necessarily, but it helps. With the robot between the machines, one reach covers both doors and the arm never travels far. The pedestal in this cell raises the robot so it can reach into each machine’s opening without a long stretch.
Can one robot tend more than two lathes?
In principle yes, when the cycles are long and the loading moves are short. Each extra machine adds travel and takes a slice of the robot’s time, so the question is whether the robot can clear every hand-off inside the machines’ cutting window.
What decides the cycle here?
The turning time on each machine, and how the robot’s moves fit between the two. Send the shaft drawing with the surfaces you machine marked and we can estimate it.
Get a layout and cycle-time estimate
Send us:
- Shaft drawing with the surfaces you machine marked
- Material, blank size and tolerances
- Number of part numbers and how often you change over
- Daily or annual volume and shift pattern
- Photos or dimensions of the floor space
We will reply with a cell layout proposal and a cycle-time estimate.
Send your part drawing → or email [email protected]
Footage filmed at a partner’s production site. Cycle time, current and consumable figures from that site are not public and are not given here.