A robot-tended line pays off when every machine stays busy instead of waiting for service. Three numbers per machine are enough to check that before you buy: how long the machine runs on its own, how long a robot needs to serve it, and what one machine hour is worth to you. The six steps below turn those numbers into machines per robot, utilisation and a payback range.

Two robots tend the same cup-forming machine from either side

The thermos cup line in the video is a useful picture to keep in mind. Several six-axis robots stand in front of a row of forming machines, two of them working either side of one machine with their grippers reaching in, and short conveyors and crates sit between the stations.

Step 1: separate machine time from service time

For every machine on the line, write down two figures:

  • R, run time: how long the machine works on one part without help
  • S, service time: how long the robot needs to open, unload, load and restart it, including the move to and from the machine

Machine interference is the key idea. It is the time a finished machine sits idle because its attendant, human or robot, is busy elsewhere. Any interference lowers output, so the first check is whether a robot can finish one service before the next machine it serves finishes its cycle.

Step 2: estimate machines per robot

A robot can serve at most about (R + S) / S machines without making them wait. This simple estimate follows from the interference definition. It ignores the chance that two machines finish at the same moment.

Illustrative example, not a measured case: R = 150 s and S = 40 s gives (150 + 40) / 40 = 4.75. Plan for four machines at most, and fewer once you allow for simultaneous finishes.

When R is short relative to S, (R + S) / S drops towards one or two, and a robot per machine becomes the natural layout.

Step 3: shorten S before adding robots

The service time is where design choices pay. A dual gripper lets the robot pick the finished part and place the next blank in one visit, instead of load, wait, unload, fetch. In one published case this cut the tending cycle from 27 s to 15 s, a saving of 12 s per cycle. That case was vendor-reported, but the mechanism applies to any loading job. The order of the moves matters as well. Academic work on dual-gripper machine tending treats the loading sequence as a scheduling problem whose best answer depends on the machine and robot times.

Step 4: convert time into utilisation

Utilisation of a tended machine is R / (R + time the machine waits for service).

Illustrative example: a 150 s machine cycle with a 25 s manual change gives 150 / 175 = 86% before breaks. A 10 s robot swap on the same cycle gives 150 / 160 = 94%.

Manual tending loses more than the change itself. One automation vendor says operator-bound load and unload, breaks and shift changes together cost most shops 20–40% of spindle time. Test that figure against your own machine data before you rely on it. For context, one OEE software vendor’s benchmark puts world-class lines around 85% and typical plants at 40–60%. Always state which OEE definition and measurement period you are comparing.

Step 5: size the buffer for unattended running

Unattended running time is roughly the number of parts in the input buffer × cycle time. Illustrative example from a vendor white paper: a 45-slot pallet at 2.5 minutes per part gives about 112 minutes of running, so the pallet is refilled four times a shift instead of an operator standing at the machine all day.

A row of robots in front of the forming machines on the cup line

Step 6: estimate payback honestly

Simple payback = total up-front cost ÷ yearly net gain.

  • Cost: robots, grippers, integration and programming, guarding and safety, training
  • Gain: labour saved, plus the value of extra machine hours you can actually sell, minus maintenance

Illustrative example: a cost of 150,000 and a yearly net gain of 75,000 (same currency) pay back in 2 years. Published payback figures vary widely. One robot vendor says most tending systems pay back in 12–24 months, and another vendor’s lathe example reaches 5–6 months only by assuming two shifts, an extra unattended shift and that every extra part is sold. Peer-reviewed work on robot payback notes that common practice counts only a few costs and savings. Count all of them, and if the project is large, include financing cost.

A conveyor carries cup bodies between the robot-tended stations

Run the numbers on your line

We can work through these six steps with your figures: the machine list with run time per part and today’s manual change time, target output per shift and number of shifts, part size and weight and how parts arrive and leave, labour cost per operator, the value of one machine hour, and a floor layout. Book the calculation with us or send the list to [email protected]. You get back a machines-per-robot estimate, a utilisation comparison and a payback range.

Awesome! Share to:

EVS TECH CO., LTD
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.